JMJ Construction Co Inc
New Lisbon, WI
UEI J7WLXMNHW9D3
CAGE 867A7
Small business
Unconfirmed listing.
Primes and agencies searching for commercial and institutional building construction firms in Wisconsin see this listing as unconfirmed.
Confirmed listings appear first in search.
- Street address
- On file, shown once confirmed
- Contact form
- Off until confirmed
- Capabilities
- Not added
Capabilities
This firm hasn't added its capabilities yet. Is this your company?
Recent public awards
19 public awards in the last 3 years · $8.4M · federal
| Year | Agency | Work | Level | Amount |
|---|---|---|---|---|
| 2026 | Department of Defense Department of the Army |
Modification for ce vm asphalt repairs iaw statement of work. | Federal | $29K |
| 2026 | Department of Defense Department of the Army |
The contractor shall provide all plant, labor, materials, equipment, transportation, and supervision necessary to repair the entrance of building 424 at truax field, wi, in accordance with the attached statement of work (sow), drawings, and specs. | Federal | $107K |
| 2025 | Department of Defense Department of the Army |
Replace hvac basewide - yaqf252030 | Federal | $480K |
| 2025 | Department of Defense Department of the Army |
Replace water heaters basewide - yaqf252031 | Federal | $129K |
| 2025 | Department of Defense Department of the Army |
Provide all parts, labor, tools, equipment, materials, transportation, and supervision necessary to repair floor s3 conference room b713, fort mccoy, wi; in accordance with the specifications, drawings, and contract documents. | Federal | $25K |
| 2025 | Department of Defense Department of the Army |
The government has a requirement to alter floors in b500 at truax field, madison wisconsin as shown on the drawings and specified; including but not limited to; removal of existing coverings and replacement with terrazzo. | Federal | $235K |
| 2025 | Department of Defense Department of the Army |
Maid-iq 35% design/build - b1796 replace/renovate playground equipment; b1792 and b1796 replace gutters; b1796 window replacement at fort mccoy, wi; iaw the specifications, drawings, and contract documents. | Federal | $936K |
| 2025 | Department of Defense Department of the Army |
Provide all parts, labor, tools, equipment, materials, transportation and supervision necessary to construct install sigcom system and fire/freeze alarm b1759 b2675 in accordance with the statement of work, drawings and contract documents. | Federal | $259K |
| 2025 | Department of Defense Department of the Army |
The contractor shall provide a new hvac system at building 1679, fort mccoy, wi, in compliance with specifications, drawings, and contract documents. | Federal | $196K |
| 2025 | Department of Defense Department of the Army |
Burn tower at the fire and rescue training site at fob liberty | Federal | $1.7M |
NAICS codes
- 236220 Commercial and institutional building construction Primary
- 236118 Residential remodeling
- 237310 Highway, street and bridge construction
- 238110 Concrete and foundation work
- 238120 Structural steel and precast
- 238190 Other foundation, structure, and building exterior contractors
- 238210 Electrical contractors
- 238220 Plumbing, heating and air-conditioning contractors
- 238350 Finish carpentry contractors
- 238390 Other building finishing contractors
- 238910 Site preparation
- 238990 Specialty trades
- 332321 Metal window and door manufacturing
- 337920 Blind and shade manufacturing
Registration
- SAM.gov
- Active
- Latest award
- Jul 2026
From public records: SAM.gov, USAspending.gov and state and local procurement records.
Remove this listing