Ebl Engineers, LLC
Baltimore, MD
UEI J4KBAQR8KGG6
CAGE 8K721
Unconfirmed listing.
Primes and agencies searching for engineering services firms in Maryland see this listing as unconfirmed.
31 confirmed firms appear ahead of it in search.
- Street address
- On file, shown once confirmed
- Contact form
- Off until confirmed
- Capabilities
- Not added
Capabilities
This firm hasn't added its capabilities yet. Is this your company?
Recent public awards
35 public awards in the last 3 years · $10.1M · 33 federal, 2 state or local
| Year | Agency | Work | Level | Amount |
|---|---|---|---|---|
| 2029 | Department of Defense Department of the Army |
Apg upgrade electric grid at airbase 6-7 aberdeen proving ground, md | Federal | $425K |
| 2026 | Government Accountability Office GAO, Except Comptroller General |
Ebl engineering is requested to provide construction administration (ca) and commissioning (cx) services for the construction to upgrade hvac systems in zones 8, 9 & 9a on the 1st floor at the gao hq building. | Federal | $173K |
| 2026 | Department of the Interior National Park Service |
Badl quarters 200 sprinkler system | Federal | $45K |
| 2026 | Department of Defense Department of the Air Force |
Fy26 f6415 swtg 352 swts 3l3980 fm9 bldg 730 hvac design fee | Federal | $309K |
| 2026 | Department of Defense Department of the Air Force |
The requirement is to obtain architect-engineer (a-e) design services for the necessary upgrades, repairs, and a new high-voltage redundancy connection for electrical switching stations b18 and b168 on joint base anacostia-bolling (jbab). | Federal | $2.4M |
| 2026 | Department of the Interior National Park Service |
Title iii a&e support services for ford's theatre | Federal | $78K |
| 2025 | Department of Defense Department of the Air Force |
The requirement is to obtain architect-engineer (a-e) services to develop a detailed work plan outlining processes and methods for surveying 136 buildings and inventorying backflow preventers on joint base anacostia-bolling (jbab). | Federal | $302K |
| 2025 | Department of Defense Department of the Air Force |
Conduct a base wide grounding and lightning survey and provide a report on the existing grounding conditions of the buildings listed in the saes. | Federal | $276K |
| 2025 | Department of Defense Department of the Air Force |
Project number 24-3205 fire control system study at visiting officers quarters | Federal | $122K |
| 2025 | Department of the Interior National Park Service |
Ffp -- the contractor shall provide all labor for a/e services necessary to complete design of filene center fire suppression system remodel at wolf trap national park, in accordance with the statement of work sent with the rfq dated 9/16/2025 and th | Federal | $196K |
NAICS codes
- 541330 Engineering services Primary
- 541310 Architectural services
- 541611 Administrative management and general management consulting services
- 561210 Facilities support services
Registration
- SAM.gov
- Active
- Latest award
- Sep 2029
From public records: SAM.gov, USAspending.gov and state and local procurement records.
Remove this listing